Construction update April 2017 Block B – The Ocean Suites

The Ocean Suites project introduces updated construction photos of April 2017.

 

1. Installing rebar & formwork for slab

 

Apr 04_Attic_Installing rebar & formwork for slab (1) Apr 04_Attic_Installing rebar & formwork for slab (2)

 

2. Placing concrete for slab 

 

Apr 07_Attic_Placing concrete for slab (1) Apr 07_Attic_Placing concrete for slab (2)

 

3. Installing rebar & formwork for wall 

 

Apr 12_Attic_Installing rebar & formwork for wall (1) Apr 12_Attic_Installing rebar & formwork for wall (2)

 

4. Placing concrete for wall

 

Apr 12_Attic_Placing concrete for column (1)

 

5. Brick wall works at Level 7

 

Apr 19_Level 7_Brick wall works (1)

 

 

 

6. Brick wall works completed at Level 5 & Level 6

 

Apr 10_Level 5_Brick wall works completed(1)

 

Apr 19_Level 6_Brick wall works completed(1)

 

 

7. Installation of glass handrail  for mockup

Apr 19_Level 2_Installation of glass handrail (1) Apr 19_Level 2_Installation of glass handrail completed for mockup

 

8. Installation of kitchen cabinet  for mockup 

 

Apr 19_Level 2_Installation of kitchen cabinet for mockup Apr 28_Level 2_Installation of kitchen cabinet completed for mockup

9. Tiling works for mockup 

 

Apr 19_Level 2_Tiling works for mockup (1) Apr 28_Level 2_Tiling works completed for mockup (2)

 

10. Installation of window & door completed for mockup

 

Apr 19_Level 2_Installation of window completed for mockup (1) Apr 28_Level 2_Installation of door completed for mockup (1) Apr 28_Level 2_Installation of door completed for mockup (2)

 

11. Main door & washing room door, bedroom door & bathroom door completed for mockup 

 

Apr 28_Level 2_Main door & washing room door completed for mockup Apr 28_Level 2_Bedroom door & bathroom door completed for mockup

 

12. Installing formwork for slab 

 

DCIM100MEDIADJI_0277.JPG DCIM100MEDIADJI_0275.JPG